Action F.2 Project Monitoring
  Deliverable D3 – Project Monitoring Plan
Tipo di Report: Confidenziale

                                                                            Autore

                                                                   Isabella Pecorini

                                                        Data di consegna del report

                                                                       01/02/2016

 Project co-founded by the European Commission within the
                LIFE 2014-2020 Programme

                                           1
Action F.2 Project Monitoring - Life RE Mida
LIFE RE Mida
             LIFE14 CCM/IT/000464
                    Duration:
               Jan 2016 – Dic 2018

Partner di Progetto / Project partners

                            DIEF - Dipartimento di Ingegneria Industriale
                            Università degli Studi di Firenze
                            WVG - Waste Valorization Group
                            Via di Santa Marta, 3
                            50139 Firenze – Italy
                            http://www.dief.unifi.it/

                            Regione Toscana
                            Settore Servizi Pubblici Locali
                            E Settore Energia e Inquinamenti
                            Firenze, Via di Novoli 26
                            Tel. 055/4382111
                            http://www.regione.toscana.it

                            Centro Servizi Ambiente Impianti S.p.A.
                            S.P. 7 di Piantravigne 52028 Terranuova
                            Bracciolini (AR)
                            www.csaimpianti.it

                            Siena Ambiente S.p.A.
                            Via Simone Martini, 57 –
                            53100 Siena (SI)
                            www.sienambiente.it

                        2
Action F.2 Project Monitoring - Life RE Mida
LIFE RE Mida
                                             LIFE14 CCM/IT/000464
                                                    Duration:
                                               Jan 2016 – Dic 2018

                                         Project/Progetto
Titolo completo del progetto/Project Full Title             RE Mida

Data di avvio/Project start:                                Innovative Methods for Residual Landfill Gas
                                                            Emissions Mitigation in Mediterranean Regions

Durata del Progetto/Project duration:                       1/01/2016
                                                            36 mesi/36 months

Contratto n°/Grant agreement n°:                            LIFE14 CCM/IT/000464

                                   Document/Documento
Document: N° Deliverable/Deliverable N°:                    D3

Titolo del Deliverable /Deliverable title:                  D3 – Project Monitoring Plan

Data contrattuale del Deliverable/Contractual Date 01/02/2016
of Delivery:
Editore(i)/Editor(s):                              RE Mida Staff

Autore(i)/Author(s):                                        Isabella Pecorini

Revisore(i)/Reviewer(s):                                    Prof. Ennio A. Carnevale

Partner/Partner(s):                                         DIEF-UNIFI

N. Work package/Work package n.:                            Action F.2

Titolo Work package /Work package title:                    Project Monitoring

Leader del Work package/ Work package leader:               DIEF-UNIFI

Distribuzione/Distribution (Public/Reserved):               Riservata/Reserved

Versione-Revisione/ Version-Revision:                       1

Bozza-Definitivo /Draft-Final Definitivo/Final              Bozza/Draft

N. di pagine/ Total number of pages:                        24

Parole chiave/ Keywords:                                    Monitoraggio,    valutazione,     indicatori    di
                                                            progresso/Monitoring, evaluation, Project progress
                                                            indicators

                                                        3
LIFE RE Mida
                LIFE14 CCM/IT/000464
                       Duration:
                  Jan 2016 – Dic 2018

 Innovative Methods for Residual Landfill Gas
Emissions Mitigation in Mediterranean Regions

Project Monitoring Plan

                           4
LIFE RE Mida
                                                            LIFE14 CCM/IT/000464
                                                                   Duration:
                                                              Jan 2016 – Dic 2018

Indice

Esonero di responsabilità/Disclaimer ................................................................................................................ 6

Elenco delle tabelle e delle figure ..................................................................................................................... 7

Summary............................................................................................................................................................ 8

1      Obiettivi del documento ............................................................................................................................ 9

2      Responsabilità della partnership e strategia di monitoraggio e gestione del progetto ............................ 9

3      Piano di monitoraggio ............................................................................................................................. 15

Allegato I: Project Outcome Indicators ........................................................................................................... 24

                                                                                 5
LIFE RE Mida
                                        LIFE14 CCM/IT/000464
                                               Duration:
                                          Jan 2016 – Dic 2018

Esonero di responsabilità/Disclaimer

Questo documento illustra le attività, i risultati e i prodotti del Progetto RE Mida. Alcune sue parti
potrebbero essere tutelate attraverso il Diritto di Proprietà Intellettuale (IPR). Per questo motivo vi
chiediamo di contattare il consorzio RE Mida prima di utilizzarlo (e-mail: isabella.pecorini@unifi.it).

Se ritenete che questo documento sia in qualsiasi modo lesivo dei diritti di proprietà intellettuale di vostro
possesso – come persona o come rappresentante di un’organizzazione – informateci tempestivamente. Gli
autori di questo documento hanno preso tutte le misure possibili per far si che il suo contenuto sia
accurato, consistente e legale. Tuttavia, né il partenariato nel suo insieme, né i singoli partner che
direttamente o indirettamente abbiano preso parte alla creazione e alla pubblicazione di questo
documento sono responsabili per qualsiasi cosa possa accadere come risultato del suo utilizzo. Questa
pubblicazione è stata realizzata grazie al contributo dell’Unione Europea. Il consorzio RE Mida è il solo
responsabile del contenuto di questa pubblicazione che non riflette necessariamente il pensiero
dell’Unione Europea. RE Mida è un progetto parzialmente finanziato dall’Unione Europea (Life 2014-2020
Programme).

This document contains description of the RE Mida project findings, work and products. Certain parts of it
might be under partner Intellectual Property Right (IPR) rules so, prior to using its content please contact
the consortium head for (e-mail: isabella.pecorini@unifi.it). In case you believe that this document harms in
any way IPR held by you as a person or as a representative of an entity, please do notify us immediately.
The authors of this document have taken any available measure in order for its content to be accurate,
consistent and lawful. However, neither the project consortium as a whole nor the individual partners that
implicitly or explicitly participated the creation and publication of this document hold any sort of
responsibility that might occur as a result of using its content. This publication has been produced with the
assistance of the European Union. The content of this publication is the sole responsibility of RE Mida
consortium and can in no way be taken to reflect the views of the European Union. RE Mida is a project
partially funded by the European Union.

                                                      6
LIFE RE Mida
                                                 LIFE14 CCM/IT/000464
                                                        Duration:
                                                   Jan 2016 – Dic 2018

Elenco delle tabelle e delle figure
TABELLA 1: PROGRAMMAZIONE PRELIMINARE DEGLI INCONTRI DEL TC ........................................................................ 11
TABELLA 2: PROGRAMMAZIONE PRELIMINARE DEGLI INCONTRI DELLO SC .................................................................... 14

FIGURA 1: PROCESSO DI GESTIONE, MONITORAGGIO E CONTROLLO DEL PROGETTO .................................................... 10

                                                                  7
LIFE RE Mida
                                        LIFE14 CCM/IT/000464
                                               Duration:
                                          Jan 2016 – Dic 2018

Summary
This document contains RE Mida Monitoring Plan, with the scope of continuously check of project activities
against the project objectives in order to keep tight control of the project scope, by being vigilant about
change, and implementing a change management process if needed. The main objectives of the Project
monitoring Plan are to ensure that the project meets its objectives within budget and scheduled timescales,
and that administrative and financial obligations are duly accomplished.

The partnership defines a Monitoring Plan with indicators and sources of verification that will delineate the
monitoring framework (what, when, who, how). The indicators are used to measure the output and the
development of the project. These indicators will also contribute to measure the performance of the
programme.

Project development will be monitored at two levels: progress against work plan on day-to-day basis and
technical monitoring project review meetings to verify general progress against overall plan and financial
considerations. The Project Manager and other technical resources who collaborate in the activity will
conduct the monitoring.

At the end of the project, the Project Monitoring Plan will include an evaluation and reflection step in order
to gather the most important lessons learned. Monitor and evaluation reports consists of periodical filling
in of sections of the Project Monitoring Plan

                                                      8
LIFE RE Mida
                                          LIFE14 CCM/IT/000464
                                                 Duration:
                                            Jan 2016 – Dic 2018

1 Obiettivi del documento
Il presente documento riporta il piano di monitoraggio del Progetto LIFE RE Mida, formato da indicatori di
progresso e fonti di verifica che sono stati definiti dal team di progetto per il monitoraggio delle attività
specificando cosa viene misurato, come, quando e chi è responsabile della misura.

L’obiettivo del piano di monitoraggio è quindi quello di assicurare che i risultati attesi del Progetto RE Mida
vengano conseguiti con il budget previsto e nei tempi prestabiliti e che siano assolti tutti gli obblighi formali
sanciti con la firma del Grant Agreement. Il piano di monitoraggio di seguito presentato ha inoltre come
obiettivi quelli di: facilitare il processo di gestione del progetto, legittimare la credibilità del progetto,
motivare e responsabilizzare in egual misura i partner e trasferire e riprodurre i risultati ottenuti.

Lo stato di avanzamento del progetto sarà monitorato inoltre rispetto ai rischi identificati dell’Analisi di
Rischio (Deliverable D2 -Contingency Plan) e segnalati allo Sterring Committee (SC) che, attraverso questi
strumenti di gestione, sarà in grado di garantire l’efficacia delle attività progettuali dell’ottica del best value
for money ed il raggiungimento dei benefici ambientali rispetto alla climate change mitigation.

2 Responsabilità della partnership e strategia di monitoraggio e gestione
  del progetto
Il DIEF, in qualità di beneficiario coordinatore, è responsabile della gestione del progetto (Azioni F1) e
responsabile quindi di effettuare tutte le attività di monitoraggio necessarie per valutare i progressi delle
azioni progettuali. Il monitoraggio sarà coordinato in particolare dal Project Manager e altre risorse
tecniche che collaboreranno nell'attività secondo la struttura manageriale del progetto definita nel
proposal e confermata in sede di firma del Partnership Agreement (si faccia riferimento a quanto riportato
nel Deliverable D1 - Kick-off meeting Report).

Lo sviluppo delle attività sarà quindi monitorato secondo il processo di gestione schematizzato in Figura 1,
che sarà attivato in due occasioni:

       Dalle verifiche dell’avanzamento delle attività rispetto a quanto pianificato effettuate durante gli
        incontri tecnici di programmazione delle attività tenute dal Techincal Commitee (TC);

       con la revisione del progetto dal punto di vista finanziario effettuata su base trimestrale dal
        Financial Manager che revisionerà la documentazione di rendicontazione messa a disposizione dai
        partner.

Al fine di garantire una gestione più efficiente del progetto e facilitare il suo monitoraggio verrà garantita
particolare attenzione ai processi di comunicazione interna. Sarà responsabilità del Rappresentante del TC
mettere a disposizione di tutti i partecipanti al progetto i verbali delle riunioni tecniche del TC (verbali di

                                                        9
LIFE RE Mida
                                          LIFE14 CCM/IT/000464
                                                 Duration:
                                            Jan 2016 – Dic 2018

programmazione) attraverso l’upload su una sezione riservata del sito internet del progetto. Saranno quindi
incentivate le attività di reporting interno semi-informale come valido strumento per il monitoraggio in
continuo dell’avanzamento dei lavori e delle spese effettuate nell’ottica della responsabilità condivisa del
progetto. Nela parte riservata del sito internet sarà inoltre sviluppata un unico sistema di gestione della
documentazione comune a tutti i partner.

Nel processo di gestione sarà responsabilità del Project Manager, che ha il compito di aggiornare
mensilmente il monitor del progetto, valutare se le attività di progetto si discostano in maniera significativa
da quanto programmato, richiamando in caso affermativo quanto riportato nel Contingency Plan.

Figura 1: Processo di gestione, monitoraggio e controllo del Progetto

Si riporta di seguito la programmazione preliminare delle riunioni dei due organi di gestione del progetto
effettuata sulla base del cronoprogramma, delle scadenze di consegna dei deliverable e dei report di
rendicontazione e sulla base delle milestones che si intendono conseguire durante le attività.

                                                         10
LIFE RE Mida
                                                                   LIFE14 CCM/IT/000464
                                                                          Duration:
                                                                     Jan 2016 – Dic 2018

Tabella 1: Programmazione preliminare degli incontri del TC

       Data (trimestre riferimento)                Ordine del giorno

                                                      Aggiornamento sull’avanzamento delle attività progettuali
                                                      Condivisione e revisione degli elaborati progettuali redatti:
                                                       - Contingency Plan

                                                       - Project Monitoring Plan

                                                       - Annual Communication Plan
1      16/05/2016 (II 16)
                                                      Discussione del mandato e programmazione delle attività del TC
                                                      Condivisione Project Outcome Indicator
                                                      Revisione dei Budget e delle spese ammissibili,
                                                      Preparazione I incontro Monitor progetto
                                                      Definizione dei contenuti del I Report Tecnico:
                                                       “Baseline study of the pilot landfills and definition of dimensional parameters, efficiencies and materials
                                                       for the pilot scale demonstration biofiltration systems”

                                                    Aggiornamento sull’avanzamento delle attività progettuali
                                                    II Report Tecnico:
                                                   Parte I - Progetto del biofiltro
2      01/07/2016 (III 16)
                                                   Parte II - Progetto delle biowindow

                                                      Discussione del Piano di monitoraggio e controllo dei pilota (PMC)
                                                      Discussione dei contenuti del III Report Tecnico e divisione dei compiti:

                                                                                   11
LIFE RE Mida
                                                    LIFE14 CCM/IT/000464
                                                           Duration:
                                                      Jan 2016 – Dic 2018

    Data (trimestre riferimento)   Ordine del giorno

                                       “Monitoring and control plan of the pilot biofiltration system and preliminary results”

                                      Preparazione per la visita degli Stakeholder agli impianti pilota
                                      Preparazione II incontro con Monitor progetto.
                                      Aggiornamento sull’avanzamento delle attività progettuali
                                      Discussione dei risultati del primo ciclo di monitoraggio ed analisi delle eventuali criticità tecniche
3   15/01/2017 (I 17)                 Verifica dei Project Outcome Indicator
                                      Discussione dei contenuti del IV Report Tecnico e divisione dei compiti:
                                       Monitoring activities and assessment of performance of the biofiltration system, First semester

                                      Programmazione della Visita Tecnica prevista per il II semestre 2017.
                                      Divisione dei compiti per la preparazione del Midterm Report
                                      Discussione dei risultati del secondo ciclo di monitoraggio ed analisi delle eventuali criticità tecniche
4   01/04/2017 (II 17)                Discussione dei contenuti del V Report Tecnico e divisione dei compiti:
                                       Monitoring activities and assessment of performance of the biofiltration system, Second semester.

                                    Organizzazione del mid-term workshop
5   01/10/2017 (IV 17)              Divisione dei compiti per la preparazione del Progress Report
                                    Organizzazione dell’evento di diffusione c/o Ecomondo 2017
                                    Discussione dei risultati del terzo ciclo di monitoraggio ed analisi delle eventuali criticità tecniche
                                    Verifica dei Project Outcome Indicator
6   15/01/2018 (I 18)
                                    Discussione dei contenuti del VI Report Tecnico e divisione dei compiti:
                                   Monitoring activities and assessment of performance of the biofiltration system, Third semester.

                                                                 12
LIFE RE Mida
                                                    LIFE14 CCM/IT/000464
                                                           Duration:
                                                      Jan 2016 – Dic 2018

    Data (trimestre riferimento)   Ordine del giorno

                                    Discussione dei risultati del quarto ciclo di monitoraggio ed analisi delle eventuali criticità tecniche
                                    Discussione dei contenuti del VII Report Tecnico e divisione dei compiti:
7   01/08/2018 (III 18)
                                   Monitoring activities and assessment of performance of the biofiltration system, Fourth semester.

                                      Programmazione e definizione dei contenuti del Final Seminar.
                                      Discussione dei risultati del Progetto e divisione dei compiti per la redazione delle Linee Guida
                                      Discussione dei contenuti degli elaborati tecnici in consegna:
                                       - Environmental impact assessment

                                       - Technical and economic assessment

                                       - Socio-economic assessment
8   30/11/2018 (IV 18)
                                       - Risk Assessment

                                      Discussione dei contenuti dell’AfterLIFE Communication Plan
                                      Organizzazione Final Seminar
                                      Verifica dei Project Outcome Indicator
                                      Organizzazione delle attività AfterLIFE: discussione del potenziale di replicabilità, trasferibilità e
                                       sostenibilità dei risultati
                                      Divisione del lavoro per la redazione del Final Report.

                                                                  13
LIFE RE Mida
                                                                    LIFE14 CCM/IT/000464
                                                                           Duration:
                                                                      Jan 2016 – Dic 2018

Tabella 2: Programmazione preliminare degli incontri dello SC

        Data (trimestre riferimento)                Ordine del giorno

                                                       Aggiornamento sull’avanzamento delle attività progettuali
                                                       Controllo dei prodotti del Progetto (Deliverables in consegna)
                                                       Valutazione dello stato dei costi sostenuti
1       17/05/2016 (II 16)
                                                       Verifica dei file di rendicontazione
                                                       Revisione dei Budget e verifica di eventuali errori/discostamenti
                                                       Preparazione I incontro Monitor progetto
                                                       Redazione elenco dei dubbi e delle criticità.
                                                       Aggiornamento sull’avanzamento delle attività progettuali
2       01/11/2016 (IV 16)                             Valutazione dello stato dei costi sostenuti
                                                       Verifica dei file di rendicontazione
                                                       Analisi della risposta degli Stakeholders
3       01/05/2017 (II 17)                             Verifica del corretto svolgimento del progetto (aspetti tecnici e di rendicontazione) in vista della
                                                        redazione del Mid-term Report
                                                     Verifica del corretto svolgimento del progetto (aspetti tecnici e di rendicontazione) in vista della
4       01/11/2017 (IV 17)
                                                        redazione del Progress Report
                                                     Aggiornamento sul coinvolgimento degli Stakeholders in preparazione di Ecomondo
5       01/05/2018 (II 18)                          (se necessario)
                                                     Verifica del corretto svolgimento del progetto (aspetti tecnici e di rendicontazione) in vista della
6       01/11/2018 (IV 18)
                                                        redazione del Final Report
                                                     Discussione del potenziale di replicabilità, trasferibilità e sostenibilità dei risultati del Progetto
7       15/12/2018 (IV 18)
                                                       Verifica documentale utile alla chiusura del Progetto

                                                                                  14
LIFE RE Mida
                                          LIFE14 CCM/IT/000464
                                                 Duration:
                                            Jan 2016 – Dic 2018

3 Piano di monitoraggio
Il piano di monitoraggio di seguito presentato è stato strutturato attorno da un gruppo di indicatori
controllabili in maniera oggettiva. Il pano individua inoltre i momenti critici del progetto in cui risulta
necessario garantire il controllo di ogni indicatore (deadline) rimandando al partner responsabile
dell’azione la verifica del suo raggiungimento.

Gli indicatori sono stati scelti in relazione diretta con gli obiettivi del progetto che, declinati nello specifico
delle attività progettuali, si misurano nelle Milestone e nei Deliverable che devono essere conseguiti e
prodotti da ciascuna azione e sotto-azione. A seconda del tipo di indicatore prescelto (indicatore di output,
indicatore di risultato e indicatore di impatto) sono stati stabiliti dei valori di soglia in base ai quali può
essere deciso il loro raggiungimento.

Alcuni degli indicatori di progresso valutati nel presente piano di monitoraggio rientrano fra i Project
Outcome Indicators, indicatori la cui valutazione è richiesta dalla EU al fine di valutare le performance del
programma LIFE. Si ritiene che l’aggiornamento di questi indicatori, che verrà effettuato nell’ambito
dell’azione D1, e la loro condivisione con la partnership del progetto sia utile anche al monitoraggio del
progressi del progetto nell’ambito dell’azione F2. Si allega pertanto la tabella relativa a questi indicatori
come condivisa con l’agenzia di controllo NEEMO (allegato I).

                                                        15
LIFE RE Mida
                                                                                          LIFE14 CCM/IT/000464
                                                                                                 Duration:
                                                                                            Jan 2016 – Dic 2018

                                                                                                                                                                                             Partner      responsabile
                                                                                                                                                                                             della verifca

                                                                                                                                                                                              DIEF-UNIFI
         Risultati attesi                                Indicatori                                    Soglia                                                                   Deadline

                                                                                                                                                                                                                CSAI

                                                                                                                                                                                                                       SA
                                                                                                                                                                                                           RT
Azione

                                                                                                       Monitoraggio delle emissioni diffuse
         Baseline study per la discarica di Podere il
                                                         Completezza dello studio                      Caratterizzazione delle emissioni di NMVOC                               15/04/2016    X
         Pero e per la discarica di Monticiano
                                                                                                       Analisi dei parametri meteo-climatici
                                                         Scelta del materiale                          si/no
         Caratterizzazione dei materiali biofiltranti                                                  Caratterizzazione chimica, fisica e di stabilità biologica di almeno 2
A1                                                                                                                                                                              15/04/2016    X
         disponibili                                     Completezza della caratterizzazione           materiali
                                                                                                       Completamento dei test in colonna
         Valutazione delle efficienze di ossidazione e
         dati utili al dimensionamento dei sistemi       Completamento del I Report Tecnico            si/no                                                                    15/04/2016    X
         pilota
                                                                                                       Completamento delle attività di preparazione del sito
         Costruzione del prototipo c/o la discarica di                                                 Operatività delle varie parti funzionali:
                                                         Completamento delle attività di costruzione                                                                            15/06/2016                      X
         Podere il Pero                                                                                Sistema di gestione dei colaticci
                                                                                                       Sistema di alimentazione del biogas
         Installazione del sistema di misura e
                                                         Finalizzazione del prototipo                  Funzionamento degli strumenti di misura e monitoraggio                   01/07/2016                      X
C1       acquisizione
                                                         Completamento del II Report Tecnico - I
                                                                                                       si/no
                                                         parte
         Progetto definitivo del prototipo                                                             Il Report contiene:                                                      01/07/2016                      X
                                                         Completezza del II Report Tecnico - I parte   Le tavole di dettaglio dei biofiltro
                                                                                                       La descrizione delle attività di costruzione
         Costruzione del prototipo c/o la discarica di                                                 Completamento delle attività di preparazione del sito
C2                                                       Finalizzazione del prototipo                                                                                           15/06/2016                             X
         Monticiano                                                                                    Operatività delle varie parti funzionali

                                                                                                           16
LIFE RE Mida
                                                                                          LIFE14 CCM/IT/000464
                                                                                                 Duration:
                                                                                            Jan 2016 – Dic 2018

                                                                                                                                                                                                    Partner      responsabile
                                                                                                                                                                                                    della verifca

                                                                                                                                                                                                     DIEF-UNIFI
         Risultati attesi                                Indicatori                                          Soglia                                                                  Deadline

                                                                                                                                                                                                                       CSAI

                                                                                                                                                                                                                              SA
                                                                                                                                                                                                                  RT
Azione

                                                         Completamento del II Report Tecnico - II
                                                                                                             si/no
                                                         parte
         Progetto definitivo del prototipo                                                                   Il Report contiene:                                                     01/07/2016                               X
                                                         Completezza del II Report Tecnico - II parte        Le tavole di dettaglio delle biowindow
                                                                                                             La descrizione delle attività di costruzione
         Condivisione    del     programma       di
                                                         Completamento       del      Protocollo        di
C3       monitoraggio preliminare e delle procedure                                                          si/no                                                                   01/07/2016      X
                                                         monitoraggio preliminare
         di campionamento
                                                                                                             4 caratterizzazioni complete del materiale biofiltrante
                                                                                                             Analisi mensile del biogas in ingresso
                                                                                                             Controllo mensile dei profili delle temperature nel media filtrante
                                                                                                             Analisi delle condizioni meteo-ambientali                               01/07/2016
         Implementazione    del     protocollo  di
                                                                                                             Mappatura delle concentrazioni di O2 nel letto filtrante                -
         monitoraggio c/o la discarica di Podere il      Completezza del monitoraggio del biofiltro
                                                                                                             Controllo mensile dei flussi emessi dal biofiltro                       01/07/2018
         Pero
                                                                                                             Controllo mensile delle concentrazioni dei gas interstiziali            con verifica
C4                                                                                                           4 indagini analitiche sulle emissioni di odori e NMOVOC                 tramite         X
                                                                                                             Valutazione degli aspetti critici per la gestione ed il controllo del   rapporto
                                                                                                             biofiltro                                                               tecnico
                                                                                                             4 caratterizzazioni complete del materiale biofiltrante                 mensile
                                                                                                             Analisi mensile del biogas in ingresso
         Implementazione      del     protocollo    di   Completezza del monitoraggio del sistema di
                                                                                                             Controllo mensile dei profili delle temperature nel media filtrante
         monitoraggio c/o la discarica di Monticiano     biowindow
                                                                                                             Analisi delle condizioni meteo-ambientali
                                                                                                             Mappatura delle concentrazioni di O2 nel letto filtrante

                                                                                                                 17
LIFE RE Mida
                                                                                              LIFE14 CCM/IT/000464
                                                                                                     Duration:
                                                                                                Jan 2016 – Dic 2018

                                                                                                                                                                                                  Partner      responsabile
                                                                                                                                                                                                  della verifca

                                                                                                                                                                                                   DIEF-UNIFI
         Risultati attesi                                Indicatori                                        Soglia                                                                    Deadline

                                                                                                                                                                                                                     CSAI

                                                                                                                                                                                                                            SA
                                                                                                                                                                                                                RT
Azione

                                                                                                           Controllo mensile dei flussi emessi dal biofiltro
                                                                                                           Controllo mensile delle concentrazioni dei gas interstiziali
                                                                                                           4 indagini analitiche sulle emissioni di odori e NMOVOC
                                                                                                           Valutazione degli aspetti critici per la gestione ed il controllo del
                                                                                                           sistema di biowindow
                                                         Consegna di 4 Report Tecnici semestrali           si/no
                                                                                                                                                                                     01/01/2017
         Caratterizzazione e controllo del processo di                                                     Sono riportati tutti i parametri monitorati
                                                                                                                                                                                     01/07/2017
         biofiltrazione    e    valutazione      delle                                                     Viene valutata la performance dei prototipi                                             X
                                                         Completezza dei Report Tecnici semestrali                                                                                   01/01/2018
         performance dei prototipi                                                                         Vengono descritte le principali problematiche di funzionamento e le
                                                                                                                                                                                     01/08/2018
                                                                                                           attività di manutenzione effettuate
                                                                                                                                                                                     01/10/2017
                                                                                                                                                                                     01/01/2017
                                                         Completamento      della    tabella       degli
         Monitoraggio degli impatti del progetto                                                           si/no                                                                     01/07/2017    X
                                                         Outcomes Project Indicators
                                                                                                                                                                                     01/01/2018
D1                                                                                                                                                                                   01/08/2018

                                                         Completamento della analisi di rischio            si/no
         Valutazione dei rischi legati ai composti
                                                                                                                                                                                     31/12/2018    X
         emessi dalle tecnologie proposte                                                                  Modello micrometeorologico e di dispersione degli inquinanti
                                                         Completezza dell’analisi di rischio
                                                                                                           Mappe delle ricadute di composti cancerogeni o pericolosi
                                                         Completamento         dell’analisi     tecnico-
         Valutazione        tecnico         economica                                                      Analisi costi-benefici effettuata
                                                         economica
D2       dell’applicazione full-scale delle tecnologie                                                                                                                               31/12/2018    X
                                                                                                           Più di uno scenario di applicazione è stato considerato nell’analisi
         dimostrate                                      Completezza dell’analisi tecnico-economica
                                                                                                           È stata effettuata l’analisi di sensitività ed incertezza dei risultati

                                                                                                               18
LIFE RE Mida
                                                                                          LIFE14 CCM/IT/000464
                                                                                                 Duration:
                                                                                            Jan 2016 – Dic 2018

                                                                                                                                                                                                   Partner      responsabile
                                                                                                                                                                                                   della verifca

                                                                                                                                                                                                    DIEF-UNIFI
         Risultati attesi                               Indicatori                                         Soglia                                                                     Deadline

                                                                                                                                                                                                                      CSAI

                                                                                                                                                                                                                             SA
                                                                                                                                                                                                                 RT
Azione

                                                        Completamento dell’analisi ambientale              Analisi LCA effettuata
         Valutazione degli impatti ambientali delle                                                        Più di uno scenario di applicazione è stato considerato nell’analisi LCA
                                                                                                                                                                                      31/12/2018    X
         tecnologie dimostrate                          Completezza dell’analisi ambientale                È stata effettuata l’analisi di sensitività ed incertezza dei risultati
                                                                                                           Sono stati completati i bilanci di massa ed energia
                                                        Completamento dei questionari utile alla
                                                        valutazione dell’impatto socio economico           Invio di almeno 30 questionari                                                           X
                                                        del progetto
         Questionari (general public) utili alla
                                                                                                           Formulazione di almeno 10 domande relativo all’impatto derivante
         valutazione dell’impatto socio economico       Completezza      delle    indagini      tramite
                                                                                                           dall’introduzione nel contesto dell’intervistato nelle tecnologie
         del progetto                                   questionario
                                                                                                           dimostrate                                                                 01/12/2017    X

                                                        Efficacia delle indagini tramite questionario      Almeno 15 questionati riempiti
D3
                                                        Completamento dell’attività di intervista
                                                                                                           Almeno 20 ingegneri di processo invitati alla intervista
         Completamento dell’attività di intervista      degli stakeholder
                                                                                                                                                                                      01/02/2018    X
         tecnici di settore                             Completezza dell’attività di intervista degli
                                                                                                           Almeno 10 ingegneri di processo intervistati
                                                        stakeholder
                                                        Completamento         della          valutazione
                                                                                                           Redazione del Report sugli impatti socio-economici
         Valutazione degli impatti socio-economici      dell’impatto socio-economica
                                                                                                                                                                                      31/12/2018    X
         delle tecnologie dimostrate                    Completezza della valutazione dell’impatto         Completamento del data-set e della valutazione dell’impatto socio-
                                                        socio-economica                                    economico in più di uno scenario di applicazione delle tecnologie
         Buona     riuscita della     strategia    di                                                                                                                                 01/03/2016
                                                        Completamento dell’Annual Communication
E1       comunicazione delle attività e dei risultati                                                      si/no                                                                      01/03/2017                 X
                                                        Plan da aggiornare su base annuale
         del progetto                                                                                                                                                                 01/03/2018

                                                                                                               19
LIFE RE Mida
                                                              LIFE14 CCM/IT/000464
                                                                     Duration:
                                                                Jan 2016 – Dic 2018

                                                                                                                                                                  Partner      responsabile
                                                                                                                                                                  della verifca

                                                                                                                                                                   DIEF-UNIFI
         Risultati attesi   Indicatori                                     Soglia                                                                    Deadline

                                                                                                                                                                                     CSAI

                                                                                                                                                                                            SA
                                                                                                                                                                                RT
Azione

                            Realizzazione delle Noticeboard del progetto
                                                                           si/no                                                                     01/06/2016                 X
                            (1 per partner)
                            Realizzazione del sito internet del progetto   si/no                                                                     01/06/2016                 X
                            Efficacia del sito internet del progetto       100 Iscritti al sito-newsletter
                            (monitorato in continuo tramite counter,       10 Numero di visite medio giornaliero                                     01/03/2017
                                                                                                                                                                                X
                            valutato      durante     l’aggiornamento      Durata media della consultazione del sito web di 20 min                   01/03/2018
                            dell’Annual Communication Plan)                Almeno 5 download del materiale informativo su base mensile
                            Realizzazione del logo del progetto            si/no                                                                     01/06/2016                 X
                            Efficacia degli strumenti di disseminazione
                                                                           Almeno 400 richieste di informazioni tramite mail e sito web durante la   01/03/2017
                            (valutato      durante      l’aggiornamento                                                                                                         X
                                                                           durata del progetto                                                       01/03/2018
                            dell’Annual Communication Plan)
                            Realizzazione del materiale informativo del
                            progetto formato flyer/brochure in Italiano    si/no                                                                     01/06/2016                 X
                            ed Inglese
                            Diffusione del materiale informativo del
                            progetto in formato flyer/brochure in
                                                                                                                                                     01/03/2017
                            Italiano ed Inglese (valutato durante          Distribuite ameno 600 flyer/brochure                                                                 X
                                                                                                                                                     01/03/2018
                            l’aggiornamento dell’Annual Communication
                            Plan)
                                                                                                                                                     01/03/2016
                                                                                                                                                     01/08/2016
                            Realizzazione delle Newsletter di progetto     si/no                                                                                                X
                                                                                                                                                     01/03/2017
                                                                                                                                                     01/08/2017

                                                                              20
LIFE RE Mida
                                                                                            LIFE14 CCM/IT/000464
                                                                                                   Duration:
                                                                                              Jan 2016 – Dic 2018

                                                                                                                                                                                                 Partner      responsabile
                                                                                                                                                                                                 della verifca

                                                                                                                                                                                                  DIEF-UNIFI
         Risultati attesi                              Indicatori                                     Soglia                                                                        Deadline

                                                                                                                                                                                                                    CSAI

                                                                                                                                                                                                                           SA
                                                                                                                                                                                                               RT
Azione

                                                                                                                                                                                    01/03/2018
                                                                                                                                                                                    01/08/2018
                                                                                                                                                                                    01/03/2016
                                                                                                                                                                                    01/08/2016
                                                                                                      Richiesta di informazioni di dettaglio o manifestazione di interesse a        01/03/2017
                                                       Efficacia delle Newsletter di progetto                                                                                                                  X
                                                                                                      seguito dell’invio della NewsLetter                                           01/08/2017
                                                                                                                                                                                    01/03/2018
                                                                                                                                                                                    01/08/2018
                                                       Realizzazione del Layman Report da             8 pagine di contenuti
                                                                                                                                                                                    31/12/2018                 X
                                                       distribuire al termine del progetto            Doppia lingua EN e IT
                                                       Realizzazione delle Linee Guida “Guidelines
                                                       for the design, construction, operation,
                                                                                                      si/no                                                                         31/12/2018                 X
                                                       monitoring and maintenance of the
                                                       biofiltration systems”
                                                       Rapporti stabili di collaborazione             3 collaborazioni permanenti con stakeholder di progetto                       01/01/2018                 X
                                                       Realizzazione del kick-off meeting e di un
                                                       seminario aperto al pubblico di lancio del     Partecipazione di almeno 30 persone                                           01/02/2018                 X
                                                       progetto
E2       Buona riuscita delle attività di networking   Organizzazione e realizzazione della Visita    Partecipazione di almeno due persone per partner
                                                                                                                                                                                    01/07/2017                 X
                                                       Tecnica                                        Condivisioni degli obiettivi e dei contenuti formativi della visita tecnica
                                                       Realizzazione del seminario per la             Partecipazione di almeno 30 persone
                                                       presentazione dei risultati di medio periodo   Coinvolgimento di almeno 3 stakeholder per l’organizzazione del               01/07/2017                 X
                                                       e organizzazione del workshop ad Ecomondo      workshop del progetto da realizzare a Ecomondo 2017

                                                                                                          21
LIFE RE Mida
                                                                                        LIFE14 CCM/IT/000464
                                                                                               Duration:
                                                                                          Jan 2016 – Dic 2018

                                                                                                                                                                                               Partner      responsabile
                                                                                                                                                                                               della verifca

                                                                                                                                                                                                DIEF-UNIFI
         Risultati attesi                           Indicatori                                        Soglia                                                                      Deadline

                                                                                                                                                                                                                  CSAI

                                                                                                                                                                                                                         SA
                                                                                                                                                                                                             RT
Azione

                                                    2017
                                                    Realizzazione di un workshop ad Ecomondo          Partecipazione di almeno 30 persone
                                                                                                                                                                                  01/12/2017                 X
                                                    2017                                              Almeno 2 manifestazioni di interesse e proposte di collaborazione
                                                                                                      Partecipazione di almeno 30 persone
                                                    Realizzazione di una presentazione pubblica-
                                                                                                      Coinvolgimento di almeno 3 stakeholder nella fase di revisione delle        01/10/2018                 X
                                                    seminario sui risultati finali del progetto
                                                                                                      Linee Guida
                                                    Partecipazione a Convegno/simposi          del    Avvio di attività di collaborazione con gruppi di ricerca che si occupano
                                                                                                                                                                                  01/01/2018    X
                                                    partner accademico                                delle tematiche (CLEAR Group)
                                                    Completamento           del          After-life
                                                                                                      si/no                                                                       31/12/2018                 X
                                                    Communication Plan
         Rafforzamento della Replication Strategy   Diffusione delle Linee Guida “Guidelines for      Avvio del processo di adozione formale da parte della Regione Toscana
E3                                                                                                                                                                                01/11/2018                 X
         anche al termine del finanziamento LIFE    the     design,    construction, operation,       delle Linee Guida
                                                    monitoring and maintenance of the                 Presentazione delle Linee Guida nell’ambito delle assemblee
                                                                                                                                                                                  -                          X
                                                    biofiltration systems”                            interregionali
                                                    Firma del Partnership Agreement                   si/no                                                                       01/02/2016    X
                                                    Avvio della gestione del progetto                 Nomina del personale facente parte del TC e SC e dei ruoli                  01/02/2016    X
                                                                                                      Responsabilizzazione di tutti i partner
         Efficiente gestione del progetto                                                             Condivisione del mandato
                                                    Primo appuntamento del TC e dello SC              Condivisione e accettazione del programma di lavoro                         01/06/2016    X
                                                                                                      Condivisione e approvazione del Contingency Plan e del Project
                                                                                                      Monitoring Plan

                                                                                                          22
LIFE RE Mida
                                                                                  LIFE14 CCM/IT/000464
                                                                                         Duration:
                                                                                    Jan 2016 – Dic 2018

                                                                                                                                                                             Partner      responsabile
                                                                                                                                                                             della verifca

                                                                                                                                                                              DIEF-UNIFI
         Risultati attesi                       Indicatori                                Soglia                                                              Deadline

                                                                                                                                                                                                CSAI

                                                                                                                                                                                                       SA
                                                                                                                                                                                           RT
Azione

                                                                                          Verifica documentale conformità piena                               01/07/2017
                                                Rispetto del Grant Agreement              Verifica dei Project Outcome Indicators                             31/12/2017      X
                                                                                          Verifica del conseguimento degli obiettivi del progetto             31/12/2017

                                                                                          Creazione della piattaforma on-line di condivisione dei documenti
                                                Gestione condivisa del progetto                                                                               01/06/2016      X
                                                                                          Programmazioni degli incontri del TC
                                                Verifica del Contingency Plan             Disponibilità dei verbali di avanzamento delle attività             Al termine      X
                                                                                                                                                              di      ogni
                                                Verifica dello Monitoring Plan            Disponibilità dei verbali di avanzamento delle attività             riunione di     X
E3       Efficiente monitoraggio del Progetto                                                                                                                 TC e SC
                                                                                                                                                              al termine
                                                Contatti con il monitor del progetti      Report almeno mensile del PM                                        di    ogni      X
                                                                                                                                                              mese

                                                                                              23
LIFE RE Mida
                           LIFE14 CCM/IT/000464
                                  Duration:
                             Jan 2016 – Dic 2018

Allegato I: Project Outcome Indicators

                                     24
Project Status
                         Date                                               04-28-2016 19:56:19 (MM-DD-YYYY)
                         Status                                             Open
                         Last Comment                                       None

A. Basic Information
                         Project ID                                         LIFE14 CCM/IT/000464
                         Official title                                     Innovative Methods for Residual Landfill Gas Emissions Mitigation in Mediterranean Regions
                         Acronym                                            LIFE RE Mida
                         Location                                           Toscana
                         Country                                            Italy
                         Name of coordinating beneficiary                   UNIVERSITÀ DEGLI STUDI DI FIRENZE - Dipartimento di Ingegneria Industriale
                         Level                                              Public Provincial/District
                         Type of legal entity                               Public body
                         Size                                               Large (250+)
                         Postal address                                     Piazza San marco, 4, 50121, Firenze
                         Name of contact person                             Carnevale Ennio Antonio
                         Phone                                              +39 055 2758718
                         Fax                                                +39 055 2758755
                         Email                                              isabella.pecorini@unifi.it
                         Start reference date                               2016
                         Final date                                         2018
                         Period after the project end date                  3 Years beyond

                         PARTNERS
                         Name                                               Regione Toscana
                         Level                                              Public Regional/Federal State
                         Type of legal entity                               Public body
                         Size                                               Large (250+)

                         Name                                               Centro Servizi Ambiente Impianti S.p.a.
                         Level                                              Private Local/micro SME
                         Type of legal entity                               Private commercial
                         Size                                               Small (10-49)

                         Name                                               Siena Ambiente S.p.a.
                         Level                                              Private Local/micro SME
                         Type of legal entity                               Private commercial
                         Size                                               Medium sized (50-249)

B. Priority area/Sector on which the project focuses
                         Sub-programme for Climate Action                   Climate Change Mitigation
                         Comments

C. Project specific setting
                           1.2 Ecosystem Services

                         1.3.1 EU policies and 1.3.2 EU funds Type of interrlationship with other funds
                                                                           Energy and natural resources
                                                                           Environment, consumers and health

                         1.4 Is the geographic context relevant for the project outcomes? If yes, choose the relevant one(s) from the list

                         1.5 Is the size of the length or area (to be) influenced by the project actions relevant in relation to the project outcomes
                                                                              No

                         1.6 Is the number of human beings (to be) influenced by the project actions relevant in relation to the project outcomes?
                                                                          No

D-E-F: Outputs and Outcomes
                                                                            4. Resource efficiency (including soil, forests and green circular economy)
                                                                            4.1 Resource efficiency - energy
                                                                            4.1.1 Consumption
                                                                            6. Air
                                                                            6.1 Air - emissions
                                                                            8. Climate Change Mitigation
                                                                            8.1 Greenhouse gas emissions
                                                                            8.1.1 CO2
                                                                            8.1.2 Other greenhouse gases
                                                                            10. Governance
                                                                            10.2 Involvement of non-governmental organisations (NGOs) and other stakeholders in project activities
                                                                            11. Information and awareness raising to the general public
                                                                            11.1 Website (mandatory)
                                                                            11.2 Other tools for reaching/raising awareness of the general public
                                                                            12. Capacity building
                                                                            12.1 Networking (mandatory)
                                                                            12.2 Professional training or education
                                                                            13. Jobs
                                                                            14. Contribution to Economic growth
                                                                            14.1 Running cost/operating costs during the project and expected in case of continuation/replication/transfer after the project period
                                                                            14.2 Capital cost expected in case of continuation/replication/transfer after the project
                                                                            14.2.2 Operating expenses expected in case of continuation/replication/transfer after the project period
                                                                            14.3 Future funding
                                                                            14.4.3 Entry into new geographic areas
Project Status
                        Date                                            04-28-2016 19:56:19 (MM-DD-YYYY)
                        Status                                          Open
                        Last Comment                                    None

4.1.1 Consumption
                        Specific Context                                Choose the Energy sources.                   At the beginning   At the end   3 Years beyond   Units                                          Comments
                        N/A                                             Methane                                      0                  0            0                                                               The technologies demonstrated in RE Mida
                                                                                                                                                                                                                     Project will allow to avoid the use of additional
                                                                                                                                                                                                                     natural gas needed for the thermal treatment of
                                                                                                                                                                                                                     the landfill gas with low calorific value.
                                                                                                                                                                                                                     A the end of the Project it will be possible to do
                                                                                                                                                                                                                     only qualitative estimates about this indicator.

6.1 Air - emissions
                        Specific Context                                Choose the Pollutant(s) targeted.            At the beginning   At the end   3 Years beyond   Units                                          Comments                                              Choose the Specific type(s) of pollution source
                                                                                                                                                                                                                                                                           and related measuring unit.
                        N/A                                             VOC                                          2                  1            1                g/hour                                         The considered pollution sources are landfill gas Other
                                                                                                                                                                                                                     surface emissions and the related measuring unit
                                                                                                                                                                                                                     is Nl/h*m2.
                        N/A                                             CH4 (including from livestock farming)       267                218          218              Gg/year                                        Le fonti di inquinamento considerati sono le          Other
                                                                                                                                                                                                                     emissioni di gas di discarica di superficie e l'unità
                                                                                                                                                                                                                     di misura correlato è Nl / h * m2.

8.1.1 CO2
                        Specific Context                                Choose the Main source(s) of emissions.      At the beginning   At the end   3 Years beyond   Units                                          Comments
                        N/A                                             N/A                                          20499              16708        16708            kg CO2/unit produced (production of material   The reduction mechanism exploited in RE Mida
                                                                                                                                                                      products or environmental outcomes)            Project is the microbial CH4 oxidation through
                                                                                                                                                                                                                     the biofiltration of landfill gas with low calorific
                                                                                                                                                                                                                     value. The values of CO2 equivalent emissions
                                                                                                                                                                                                                     reported here are calculated by considering the
                                                                                                                                                                                                                     yearly amount of CH4 oxidised divided per the
                                                                                                                                                                                                                     total days in a year in which the technologies are
                                                                                                                                                                                                                     functioning. The CO2 equivalent were calculated
                                                                                                                                                                                                                     by considering the a GWP of CH4 of 28 according
                                                                                                                                                                                                                     to http://www.ipcc.ch/report/ar5/wg1/.
                                                                                                                                                                                                                     The main source of emissions in the frame of RE
                                                                                                                                                                                                                     MIda Project is waste disposal.

8.1.2 Other greenhouse gases
                       Specific Context                                 Choose the main source(s) of other GHG       At the beginning   At the end   3 Years beyond   Units                                          Comments                                               Choose the Sector/s)/policy areas related to the
                                                                        emissions.                                                                                                                                                                                          main project objectives.
                        N/A                                             CH4                                          732                597          597              kg GHG/unit produced (production of material   The values of CH4 emissions reported here are
                                                                                                                                                                      products or environmental outcomes)            calculated by considering the yearly amount of
                                                                                                                                                                                                                     CH4 oxidised divided per the total days in a year
                                                                                                                                                                                                                     in which the technologies are functioning.

10.2 Involvement of non-governmental organisations (NGOs) and other stakeholders in project activities
                       Specific Context                               Choose the NGO and any other type(s) of        At the beginning   At the end   3 Years beyond   Units                                          Comments                                           Choose the Territorial level(s) at which               Choose the Type(s) of intervention.               Choose the Sectors represented by the
                                                                      stakeholders involved due to the project.                                                                                                                                                         stakeholders are involved.                                                                               stakeholders.
                       N/A                                            Public body/bodies                             1                  5            7                number of stakeholders involved due to the     Local and regional authorities holding regulatory, Regional level,                                        Interventions targeting EU environmental or       E-Water supply; sewerage; waste managment
                                                                                                                                                                      project                                        controlling and mainstreaming capability in        National level,                                        climate action policies,                          and remediation activities ,
                                                                                                                                                                                                                     waste management sector ( suche as ATO             Local level                                            at national level,                                E38-Waste collection, treatment and disposal
                                                                                                                                                                                                                     Toscana Sud - waste managing authority of                                                                 Interventions targeting other EU policies,        activities; materials recovery,
                                                                                                                                                                                                                     Arezzo and Siena districts and ARPAT- regional                                                            at national level                                 E382-Waste treatment and disposal,
                                                                                                                                                                                                                     environment protection agency) will be involved                                                                                                             E3821-Treatment and disposal of non-hazardous
                                                                                                                                                                                                                     as stakeholders.                                                                                                                                            waste,
                                                                                                                                                                                                                     In addition the Guidelines for the design,                                                                                                                  E3822-Treatment and disposal of hazardous
                                                                                                                                                                                                                     construction, operation, monitoring and                                                                                                                     waste,
                                                                                                                                                                                                                     maintenance of the biofiltration systems will be                                                                                                            O841-Administration of the State and the
                                                                                                                                                                                                                     formally adopted by Regione Toscana (Regional                                                                                                               economic and social policy of the community
                                                                                                                                                                                                                     resolution) and it will be drawn to the attention
                                                                                                                                                                                                                     to the Coordination Assembly between State and
                                                                                                                                                                                                                     Regions. The Permanent Conference for relations
                                                                                                                                                                                                                     between the state, the regions and the
                                                                                                                                                                                                                     autonomous provinces of Trento and Bolzano
                                                                                                                                                                                                                     operates within the national community to
                                                                                                                                                                                                                     promote cooperation between the activities of
                                                                                                                                                                                                                     the State and the Regions and Autonomous
                                                                                                                                                                                                                     Provinces, constituting the strategic moment of
                                                                                                                                                                                                                     political negotiations between the central
                                                                                                                                                                                                                     government and the system of regional
                                                                                                                                                                                                                     autonomy.

                        N/A                                             Private for profit                           3                  10           12               number of stakeholders involved due to the     European landfill owners and waste companies Regional level,                                              Interventions targeting EU environmental or       E-Water supply; sewerage; waste managment
                                                                                                                                                                      project                                        and Trade association of the waste management National level,                                             climate action policies,                          and remediation activities ,
                                                                                                                                                                                                                     sector (Confservizi Cispel Toscana, Utilitalia, Local level                                               at national level,                                E382-Waste treatment and disposal,
                                                                                                                                                                                                                     ATIA-ISWA Italia, ISWA) will be involved as                                                               Interventions targeting other EU policies,        E3821-Treatment and disposal of non-hazardous
                                                                                                                                                                                                                     stakeholders.                                                                                             at national level                                 waste,
                                                                                                                                                                                                                                                                                                                                                                                 E3822-Treatment and disposal of hazardous
                                                                                                                                                                                                                                                                                                                                                                                 waste
                        N/A                                             Other civil society organisations            0                  3            5                number of stakeholders involved due to the     Research Groups interested in sostainable landfill EU level,                                              Interventions targeting other EU policies,        M72-Scientific research and development,
                                                                                                                                                                      project                                        management.                                        International level                                    at EU level                                       M721-Research and experimental development
                                                                                                                                                                                                                      The scientific community is a stakeholder of the                                                                                                           on natural sciences and engineering
                                                                                                                                                                                                                     project since the
                                                                                                                                                                                                                     project proposes a high level of innovation with
                                                                                                                                                                                                                     respect to conventional treatments existing in
                                                                                                                                                                                                                     Europe.

11.1 Website (mandatory)
                      Specific Context                                  Website (mandatory)                          At the beginning   At the end   3 Years beyond   Units                                          Comments                                               Reaching and/or awareness raising of the           Choose the Indicators for raising the awareness
                                                                                                                                                                                                                                                                            general public through the project website         of Individuals.
                        N/A                                             No. of individuals                           0                  100          150                                                                                                                    Reaching                                           Following websites (likes, suscribers...).,
                                                                                                                                                                                                                                                                                                                               Asking project related questions.
                        N/A                                             No. of unique visits                         0                  100          150
                        N/A                                             Average visit duration (minutes)             0                  20           20
                        N/A                                             No. Downloads                                0                  50           100
                        N/A                                             No. of individuals                           0                  1000         2000                                                                                                                   Awareness raising                                  Following websites (likes, suscribers...).,
                                                                                                                                                                                                                                                                                                                               Asking project related questions.

11.2 Other tools for reaching/raising awareness of the general public
                         Specific Context                               Other tools for reaching/raising             At the beginning   At the end   3 Years beyond   Units                                          Comments                                               Reaching and/or awareness raising of the           Choose the Indicators for raising the awareness
                                                                                                                                                                                                                                                                            general public.                                    of Individuals.
                        N/A                                             Publications/reports                         0                  100          150                                                                                                                    Awareness raising                                  Asking project related questions.
                        N/A                                             Events/exhibitions                           0                  100          100
                        N/A                                             Print media                                  0                  200          300
                        N/A                                             Other media (video/broadcast)                0                  100          100
                        N/A                                             Hotline/information centre                   0                  0            0
                        N/A                                             Displayed information (poster, information   0                  200          300
                                                                        boards)
                        N/A                                             Publications/reports                         0                  50           70                                                                                                                     Reaching                                           Asking project related questions.
                        N/A                                             Events/exhibitions                           0                  30           30
N/A                                              Print media                                       0                                                   50                                                   70
                        N/A                                              Other media (video/broadcast)                     30                                                  30                                                   0
                        N/A                                              Hotline/information centre                        0                                                   0                                                    0
                        N/A                                              Displayed information (poster, information        0                                                   50                                                   70
                                                                         boards)

12.1 Networking (mandatory)
                      Specific Context                                   Choose the Target audience.                       At the beginning                                    At the end                                           3 Years beyond                                    Units                Comments                                        Choose the Networking tools used.
                      N/A                                                Professionals                                     0                                                   100                                                  150                                               No. of individuals                                                   Conferences,
                                                                                                                                                                                                                                                                                                                                                           Workshops,
                                                                                                                                                                                                                                                                                                                                                           Networking (mandatory)
                        N/A                                              Members of interest groups                        0                                                   20                                                   20                                                No. of individuals                                                   Platform meetings

12.2 Professional training or education
                         Specific Context                                Choose the Target audience.                       At the beginning                                    At the end                                           3 Years beyond                                    Units                Comments                                         Choose the Training/education tools used.
                         N/A                                             Students (in higher education)                    0                                                   20                                                   20                                                No. of individuals   2 bachelor/master thesis concerning the Project. Seminars,
                                                                                                                                                                                                                                                                                                                                                            Classes/courses,
                                                                                                                                                                                                                                                                                                                                                            Field trips,
                                                                                                                                                                                                                                                                                                                                                            Other training or educational events.

13. Jobs
                        Specific Context                                 At the beginning                                  At the end                                          3 Years beyond                                       Units                                             Comments             Choose the Sex of the employee(s).              Choose the Specificities of the employees.   Choose the Age group.   Choose the Level of education.                  Other specifiers:
                        N/A                                              0.05                                              0.05                                                0                                                    No. of FTE                                                             Male                                            Skilled                                      55-64                   Tertiary (ISCED levels 5-8)
                        N/A                                              0.04                                              0.04                                                0                                                    No. of FTE                                                             Male                                            Skilled                                      55-64                   Tertiary (ISCED levels 5-8)
                        N/A                                              0.5                                               0.62                                                0.5                                                  No. of FTE                                                             Male                                            Skilled                                      25-54                   Upper secondary, Post-secondary and non-
                                                                                                                                                                                                                                                                                                                                                                                                                                tertiary (ISCED levels 3-4)
                        N/A                                              0                                                 0.36                                                0                                                    No. of FTE                                                                                                             Skilled                                      25-54                   Tertiary (ISCED levels 5-8)
                        N/A                                              0                                                 0.51                                                0                                                    No. of FTE                                                             Female                                          Skilled                                      25-54                   Tertiary (ISCED levels 5-8)
                        N/A                                              0.10                                              0.25                                                0.10                                                 No. of FTE                                                             Female                                          Skilled                                      25-54                   Upper secondary, Post-secondary and non-
                                                                                                                                                                                                                                                                                                                                                                                                                                tertiary (ISCED levels 3-4)
                        N/A                                              0.01                                              0.14                                                0.04                                                 No. of FTE                                                             Male                                            Skilled                                      55-64                   Pre-primary, primary & lower secondary (ISCED
                                                                                                                                                                                                                                                                                                                                                                                                                                level 0-2)
                        N/A                                              0.01                                              0.05                                                0.01                                                 No. of FTE                                                             Male                                            Skilled                                      25-54                   Upper secondary, Post-secondary and non-
                                                                                                                                                                                                                                                                                                                                                                                                                                tertiary (ISCED levels 3-4)
                        N/A                                              0.01                                              0.03                                                0.02                                                 No. of FTE                                                             Male                                            Skilled                                      25-54                   Tertiary (ISCED levels 5-8)
                        N/A                                              0                                                 0.02                                                0.01                                                 No. of FTE                                                             Male                                            Skilled                                      55-64                   Tertiary (ISCED levels 5-8)
                        N/A                                              0                                                 0.04                                                0.01                                                 No. of FTE                                                                                                             Skilled                                      25-54                   Tertiary (ISCED levels 5-8)
                        N/A                                              0                                                 0.39                                                0.2                                                  No. of FTE                                                                                                             Skilled                                      25-54                   Tertiary (ISCED levels 5-8)
                        N/A                                              0.05                                              0.06                                                0.05                                                 No. of FTE                                                             Female                                          Skilled                                      25-54                   Tertiary (ISCED levels 5-8)
                        N/A                                              0.04                                              0.04                                                0.04                                                 No. of FTE                                                             Female                                          Skilled                                      55-64                   Tertiary (ISCED levels 5-8)
                        N/A                                              0                                                 0.02                                                0                                                    No. of FTE                                                             Female                                          Skilled                                      25-54                   Tertiary (ISCED levels 5-8)
                        N/A                                              0                                                 0.13                                                0.02                                                 No. of FTE                                                             Female                                          Skilled                                      25-54                   Tertiary (ISCED levels 5-8)
                        N/A                                              0                                                 0.26                                                0.05                                                 No. of FTE                                                             Male                                            Skilled                                      55-64                   Pre-primary, primary & lower secondary (ISCED
                                                                                                                                                                                                                                                                                                                                                                                                                                level 0-2)
                        N/A                                              0.01                                              0.09                                                0.05                                                 No. of FTE                                                             Male                                            Skilled                                      25-54                   Tertiary (ISCED levels 5-8)
                        N/A                                              0.01                                              0.05                                                0.01                                                 No. of FTE                                                             Female                                          Skilled                                      55-64                   Tertiary (ISCED levels 5-8)
                        N/A                                              0                                                 0.02                                                0.01                                                 No. of FTE                                                             Female                                          Skilled                                      55-64                   Tertiary (ISCED levels 5-8)

14.1 Running cost/operating costs during the project and expected in case of continuation/replication/transfer after the project period
                       Specific Context                                  At the beginning                                  At the end                                          3 Years beyond                                       Units                                             Comments
                       N/A                                               9000                                              855612                                              5000                                                 €

14.2.2 Operating expenses expected in case of continuation/replication/transfer after the project period
                       Specific Context                                  3 Years beyond                                    Units                                               Comments
                       N/A                                               200000                                            €                                                   Estimated capital expenditure for the
                                                                                                                                                                               construction and the monitoring of a biofiltration
                                                                                                                                                                               technology similar to those demonstrated in RE
                                                                                                                                                                               Mida Project in another landfill.

14.3 Future funding
                        Specific Context                                 Choose the Type of funding.                       3 Years beyond                                      Units                                                Comments
                        N/A                                              Beneficiaries’ own contribution                   200000                                              €                                                    Estimated capital expenditure for the
                                                                                                                                                                                                                                    construction and the monitoring of a full scale
                                                                                                                                                                                                                                    biofiltration technology.

14.4.3 Entry into new geographic areas
                        Specific Context                                 Define the territories (NUTS codes) where you     Comments
                                                                         expect to replicate/transfer your project (add
                                                                         each one separately).
                        N/A                                              ITALIA                                            Other landfill owner interested in the technology
                                                                                                                           demonstrated.
                        N/A                                              ESPAÑA                                            Other landfill owner interested in the technology
                                                                                                                           demonstrated.
                        N/A                                              ΕΛΛΑΔΑ (ELLADA)                                   Other landfill owner interested in the technology
                                                                                                                           demonstrated.
Puoi anche leggere