                          GRID S.p.A. SESTO SAN GIOVANNI (MILANO) - ITALY

        CONCEPTUAL VIEWS AND ELEVATION FOR BUILDING B: FACADE STUDIES
                                 26.02.2014
NUOVO POLO PRODUTTIVO | NEW PRODUCTION PLANT - GRID S.p.A. SESTO SAN GIOVANNI (MILANO) - ITALY
INDICE | INDEX

1. INTRODUZIONE | INTRODUCTION

2. CONTESTO e ACCESSIBILITA’ | CONTEXT AND ACCESSIBILITY

    2.1 Contestualizzazione sito
    2.2 Connessione con sistemi mobilità urbana
    2.3 Aerofotogrammetrico

3. PROGETTO GENERALE NUOVO POLO PRODUTTIVO | GENERAL PROJECT FOR NEW PRODUCTION PLANT

    3.1 Inserimento piano particolareggiato
    3.2 Planimetria generale progetto
    3.3 Sezioni generali
    3.4 Vista 3d generale
    3.5 Vista 3d edificio B

4. STUDIO DELLE FACCIATE | FACADE STUDY

    Metodologia e criteri di classificazione tipologie intervento

    4.1 Studi preliminari – colori pannelli di tamponamento
    4.2 Ipotesi di intervento tipo 1– doppia pelle
    4.3 Ipotesi di intervento tipo 2 – grafica

                                                                                        p.00
NUOVO POLO PRODUTTIVO | NEW PRODUCTION PLANT - GRID S.p.A. SESTO SAN GIOVANNI (MILANO) - ITALY
Il gruppo ALSTOM GRID intende realizzare un nuovo sito produttivo ove trasferire le attività produttive e di
1.INTRODUZIONE|INTRODUCTION   sviluppo, attualmente insediate nello stabilimento sito in Viale Suzzani a Milano. L’attività industriale
                              consiste nella realizzazione di isolatori elettrici di varie dimensioni e nell’effettuazione di prove
                              specialistiche e collaudi dei prodotti all’interno dei laboratori dedicati.
                              Per il corretto sviluppo dell’attività produttiva, ALSTOM GRID ha bisogno di una superficie complessiva
                              costruita di circa 10.000 m2, comprendente, oltre l’unità produttiva vera e propria, un laboratorio per i test,
                              una palazzina uffici, delle aree tecniche esterne, gli edifici minori per gli alloggiamenti delle utenze, oltre i
                              parcheggi pertinenziali, la viabilità e le sistemazioni a verde.
                              ALSTOM intende realizzare il nuovo insediamento nell’area a destinazione industriale ubicata nel Comune
                              di Sesto San Giovanni (MI), all’interno del Comparto Produzione e Ricerca Sud‐Piano Particolareggiato di
                              Recupero Comprensorio “Il Vulcano”.
                              Il progetto prevede la realizzazione dei seguenti corpi di fabbrica e interventi:

                              •   Edificio Produttivo
                              •   Edificio Lab Test e Annesso
                              •   Edificio Uffici
                              •   Cabine elettriche esterne e altri edifici minori
                              •   Aree tecniche esterne coperte
                              •   Sistemazioni esterne, parcheggi e viabilità

                              Il Test Lab UHV è il cuore tecnologico dell’insediamento e la sua realizzazione presenta numerosi aspetti
                              tecnologici di particolare complessità esecutiva. Il laboratorio, per le caratteristiche prestazionali previste e
                              per la dimensione interna libera, risulterà essere uno dei primi laboratori per i test elettromagnetici in
                              ambito europeo.

                              Tra gli edifici del complesso produttivo, il volume del Test Lab UHV, per le sue importanti caratteristiche
                              dimensionali (ingombro in pianta di circa 55X40 m e altezza complessiva di circa 40 m), risulta essere
                              l’elemento più visibile e caratterizzante l’intervento.
                              Per tale motivo, nell’ambito del procedimento autorizzativo S.U.A.P. è stato richiesto dalla Commissione per
                              il Paesaggio del Comune di Sesto San Giovanni di sviluppare un progetto di “mitigazione/caratterizzazione
                              ambientale”.

                              Il presente documento ha lo scopo di presentare gli studi preliminari realizzati per rispondere alle
                              prescrizioni di cui al procedimento S.U.A.P.

                              The ALSTOM GRID group intends to build a new production site in order to transfer the production
                              activities, currently set up in the factory located in Viale Suzzani in Milan. Industrial activity consists in the
                              realization of electrical insulators of various sizes and in conducting tests and inspections of products
                              within the specified laboratories.
                              For the proper development of the produc on, ALSTOM GRID needs a total area of approximately 10,000
                              square meters, including a laboratory for testing, an office building, external technical areas, electrical
                              cabins, as well as parking areas, roads and green areas, apart from the production unit itself.
                              ALSTOM intends to build the new settlement in the industrial area located in the municipality of Sesto San
                              Giovanni (MI), following the Production and Research South Area ‐ Detailed Recovery Plan " Vulcano."
                              The project involves the construction of the following buildings:

                              •   Production Building
                              •   Lab Test and Annex Building
                              •   Office Building
                              •   External electrical Cabins and other minor buildings
                              •   Technical areas
                              •   Complete landscaping, parking lots and roads

                              The Lab Test UHV is the technological heart of the industrial plant and its construction involves particular
                              and complex technological executions. Due to its expected performance properties and its internal
                              dimension, the Test Lab will be one of the first laboratory for the electromagnetic test in the European
                              area.

                              The wide volume of the Lab Test UHV (approximately 55X40 m in plan and overall height of about 40 m) is
                              the most visible element among the other buildings of the industrial plant.
                              For this reason, the Landscape Commission of Sesto San Giovanni’s municipality, in the S.U.A.P
                              authorization procedure, required to develop an environmental mitigation project.

                              The aim of this document is to present the preliminary proposals to reply to the S.U.A.P provisions.

                                                                                                                                                   p.01
NUOVO POLO PRODUTTIVO | NEW PRODUCTION PLANT - GRID S.p.A. SESTO SAN GIOVANNI (MILANO) - ITALY
2. CONTESTO e    ACCESSIBILITA’| CONTEXT AND ACCESSIBILITY

  2.1 Contestualizzazione sito | Site location

  2.2 Connessione con sistemi mobilità urbana | Metro connectivity with the site

  2.3 Aerofotogrammetrico | satellite image of the site

                                                                                   p.02
NUOVO POLO PRODUTTIVO | NEW PRODUCTION PLANT - GRID S.p.A. SESTO SAN GIOVANNI (MILANO) - ITALY
MILANO-ITALY

SESTO SAN GIOVANNI(MILANO)- ITALY

 2.1 Contestualizzazione sito                       p.03
                                    Site location
NUOVO POLO PRODUTTIVO | NEW PRODUCTION PLANT - GRID S.p.A. SESTO SAN GIOVANNI (MILANO) - ITALY
2.2 Connessione con sistemi mobilità urbana              p.04
                      Metro connectivity with the site
NUOVO POLO PRODUTTIVO | NEW PRODUCTION PLANT - GRID S.p.A. SESTO SAN GIOVANNI (MILANO) - ITALY
2.3 Aerofotogrammetrico             p.05
      Satellite image of the site
NUOVO POLO PRODUTTIVO | NEW PRODUCTION PLANT - GRID S.p.A. SESTO SAN GIOVANNI (MILANO) - ITALY
3.PROGETTO GENERALE NUOVO POLO PRODUTTIVO | PROJECT
 FOR NEW PRODUCTION BUILDING

   3.1 Inserimento piano particolareggiato | Site location in relation with
   urban context

   3.2 Planimetria generale progetto | General Plan

   3.3 Sezioni generali | General Section

   3.4 Vista 3d generale | General 3d view

   3.5 Vista 3d edificio B | 3d view of building B

                                                                              p.06
NUOVO POLO PRODUTTIVO | NEW PRODUCTION PLANT - GRID S.p.A. SESTO SAN GIOVANNI (MILANO) - ITALY
3.1 Inserimento piano particolareggiato                  p.07
        Site location in relation to the urban context
NUOVO POLO PRODUTTIVO | NEW PRODUCTION PLANT - GRID S.p.A. SESTO SAN GIOVANNI (MILANO) - ITALY
3.2 Planimetria generale progetto            p.08
               General Plan of the project
3.3 Sezioni generali        p.09
          General section
3.4 Vista 3d generale         p.10
            3d General view
Vista 3d strada ingresso            p.11
       Street view of the project
3.5 Vista 3d edificio B         p.12
        3d view of Building B
4. STUDIO DELLE FACCIATE | FACADE STUDIES

  Metodologia e criteri di classificazione tipologie intervento | Methodology and
  criterion for classification of intervention

  4.1 Studi preliminari – colori pannelli di tamponamento

  4.2 Proposta di intervento tipo 1 – doppia pelle

  4.3 Proposta di intervento tipo 2 – grafica

                                                La Commissione per il Paesaggio del Comune di S.S.Giovanni ha espresso il
                                                seguente parere prescrittivo:
                                                “….la commissione esclude per il corpo alto il rivestimento di facciata in pannelli
                                                in c.a. a meno che gli stessi non costituiscano la base per un intervento
                                                grafico/pittorico (writers) su tutte le facciate; identica esclusione riguarda la
                                                lamiera grecata a meno che le pannellature non siano oggetto di un disegno
                                                grafico. Terza ipotesi, si chiede di valutare l’utilizzo di una controfacciata con
                                                appropriate reti metalliche traslucide da integrare con il sistema di illuminazione.
                                                Parere favorevole”.
                                                Sulla base di tali indicazioni si è proceduto nello sviluppo delle ipotesi progettuali.

                                                The Landscape Commission of the S.S. Giovanni’s municipality expressed the
                                                following provision:
                                                ".... For the façade of the higher building, the commission excludes the concrete
                                                panels unless the panels themselves will become the base for a graphic
                                                intervention (writers) on all the sides; the same provision is applied for the
                                                corrugated sheet. As the third option is required to evaluate the use of a second
                                                skin with appropriate translucent wire mesh to be integrated with the lighting
                                                system. Favorable opinion. "
                                                According to this provisions we proceeded to the development of the project
                                                ideas.

                                                                                                                                          p.13
Colore | Color
                              Studi preliminari

Pelle | Skin                   Tipo 2

                              Tipo 1

Grafica | Graphics
                                Tipo 2

    Metodologia criteri riferimenti                    p.14
                 Methodology and reference to design
Studi preliminari colore: viste frontali              p.15
                           Colour study: Front view
INTERVENTI DI FACCIATA PROPOSTI
Proposte Tipo 1_Doppia pelle: viste frontali                p.17
                  Type 1_Double Skin proposal: front view
Tipo 1a   p.18
Type 1a
Tipo 1b   p.19
Type 1b
Proposte tipo 2_Grafica: viste frontali               p.20
                Type 2_Graphic proposal: front view
Tipo 2a – Vista frontale   p.21
Type 2a - Front view
Tipo 2a   p.22
Type 2a
Tipo 2b – Vista frontale   p.23
Type 2b - Front view
Tipo 2b   p.24
Type 2b