GOVERNO US E DOD - PROCUREMENT LE REGOLE DA SEGUIRE PER ACCEDERE AL MERCATO US E PER MANTENERE GLI IMPEGNI PRESI CON US GOVERNMENT

Pagina creata da Mario Mauro
 
CONTINUA A LEGGERE
GOVERNO US E DOD - PROCUREMENT LE REGOLE DA SEGUIRE PER ACCEDERE AL MERCATO US E PER MANTENERE GLI IMPEGNI PRESI CON US GOVERNMENT
Governo US e DoD – Procurement
Le Regole da Seguire per Accedere al Mercato US e per
Mantenere gli Impegni Presi con US Government

      FAR (Federal Acquisition Regulation)
      DFAR (Defense Federal Acquisition Regulation)

Ambasciata d’Italia a Washington 4-5 Novembre 2013
                       CFO
  US DCAA/DCMA Relations
           Giuseppe Riccio
  giuseppe.riccio@alenia.it
      Tel: +39 3666713283
GOVERNO US E DOD - PROCUREMENT LE REGOLE DA SEGUIRE PER ACCEDERE AL MERCATO US E PER MANTENERE GLI IMPEGNI PRESI CON US GOVERNMENT
Indice
          • Introduzione

          • L’organizzazione del Governo e del Department of Defence USA
            per valutare le Aziende, i Programmi ed i Contratti

          • I Contratti e la CWBS (Contractual Work Breakdown Structure)

          • FAR (Federal Acquisition Regulation) and DFAR (Defense
            Federal Acquisition Regulation) e CAS (Cost Accounting
            Standards)

          • Summary

                                                                             2
***gr                      Alenia Aermacchi – Washington 4-5 Novembre 2013
GOVERNO US E DOD - PROCUREMENT LE REGOLE DA SEGUIRE PER ACCEDERE AL MERCATO US E PER MANTENERE GLI IMPEGNI PRESI CON US GOVERNMENT
Il Controllo dei Costi e la Valutazione dei Programmi sono diventati l’argomento principale per
        decidere la sorte di Nazioni, Conglomerati Industriali, Multinazionali, Aziende e anche Piccole
        Imprese.

        I parametri economici e finanziari che fino a qualche anno fa regolamentavano le valutazioni sulla
        redditività di un programma non sono più sufficienti a garantire i giusti input per decretarne il
        successo o la chiusura.

        Sempre più spesso le decisioni, e quindi il destino di un’Impresa, sono in mano a Organismi
        esterni che seguono regole di valutazione a volte sconosciute a coloro che subiranno le
        conseguenze.

        Nazioni e Sistemi che più hanno subito gli eventi di questi ultimi anni hanno avviato una
        radicale, profonda e rapida rivisitazione dei propri metodi di controllo e valutazione.

        Il più grande “generatore” di contratti per le Aziende, il Governo gli Stati Uniti, constatata
        l’inefficacia dei tradizionali sistemi di “Cost Control and Program Evaluation” ha intrapreso lo
        sviluppo di nuovi evoluti metodi e ne ha imposto l’applicazione ai propri Fornitori con l’obiettivo
        di tutelare le proprie Aziende da gestioni “inadeguate”. L’obbligo dell’applicazione puntuale dei
        nuovi metodi e procedure è stato garantito tramite l’emissioni di nuove leggi ed incentivato dal
        mancato accesso a “gare”, dal rischio della cancellazione di contratti stipulati o da trattenute sui
        pagamenti di beni e servizi a volte già consegnati ed erogati.

                                                                                                               3
***gr                               Alenia Aermacchi – Washington 4-5 Novembre 2013
GOVERNO US E DOD - PROCUREMENT LE REGOLE DA SEGUIRE PER ACCEDERE AL MERCATO US E PER MANTENERE GLI IMPEGNI PRESI CON US GOVERNMENT
Così come accaduto negli anni 50 e 60 del secolo scorso, dopo la Seconda Guerra mondiale, il
        compito di introdurre le nuove regole per “correggere”, “rimodellare” e “far evolvere” i sistemi
        industriali è stato affidato agli immensi contratti del “Department of Defense” (DoD), quello che
        noi comunemente chiamiamo “Pentagono”.

        Il programma scelto come principale iniettore nei Sistemi Industriali delle nuove “rules” è il più
        grande, impegnativo, lungo, importante e costoso della storia dell’industria americana: il velivolo
        da combattimento F-35.

        Le nuove regole di controllo servono ad insegnare alle industrie a “proteggersi” meglio dalle
        evoluzioni dei mercati e dai tagli di “budget” e contemporaneamente servono a “tutelare” gli
        investimenti e gli sforzi che il Governo Americano sta facendo per rafforzare il tessuto industriale
        del Paese

        Per raggiungere questi obiettivi il Governo degli Stati Uniti ha attinto alle sue migliori risorse e
        selezionato alcune delle risorse dei suoi alleati.

        Gruppi come il CAPE, il PARCA e l’IDA, che raccolgono le migliori menti degli Stati Uniti, sono stati
        chiamati ad affrontare questa sfida.

          1.CAPE: Cost Assessment and Program Evaluation
          2.PARCA: Performance Assessments and Root Cause Analyses
          3.IDA: Institute for Defense Analyses

                                                                                                                4
***gr                                               Alenia Aermacchi – Washington 4-5 Novembre 2013
GOVERNO US E DOD - PROCUREMENT LE REGOLE DA SEGUIRE PER ACCEDERE AL MERCATO US E PER MANTENERE GLI IMPEGNI PRESI CON US GOVERNMENT
La necessità di dover fornire una appropriata risposta alle richieste del Governo Americano ha
        spinto tutte le industrie che sono interessate a collaborare con gli USA ad avviare una rapida
        analisi delle nuove procedure ed a trovare il modo più adatto per poter ottenere gli opportuni
        “Certificate” e “Validation”.

        La ricerca delle opportune risposte da parte delle Industrie è stata incentivata dalla ferma
        volontà del Governo USA di non voler più riconoscere i costi che non rispondevano alle nuove
        “rules” creando evidenti apprensioni sui margini previsti per contratti oggetto di verifica.

        L’applicazione delle nuove metodologie di “Cost Control and Program Evaluation” tutela le
        nostre Aziende ed i nostri Programmi, ci permette di prendere decisioni difficili con la
        consapevolezza di avere o meno le giuste informazioni e ci insegna ad elaborare i “billion” di
        dati che i nostri sistemi aziendali gestiscono.

        Proprio i sistemi di controllo aziendale, gli ERP, gli EVMS, con la loro espansione ed evoluzione
        hanno evidenziato problematiche inimmaginabili anni fa.

                                                                                                            5
***gr                               Alenia Aermacchi – Washington 4-5 Novembre 2013
GOVERNO US E DOD - PROCUREMENT LE REGOLE DA SEGUIRE PER ACCEDERE AL MERCATO US E PER MANTENERE GLI IMPEGNI PRESI CON US GOVERNMENT
La ricerca continua della “cattura” di ogni singolo dato che “viaggia” nelle nostre Aziende ha
        portato alla inevitabile creazione di enormi flussi strutturati di informazioni che sono sempre
        più difficili da sintetizzare in modo organizzato e coerente. “Popolare” la “Contract Work
        Breakdown Structure” con i costi sostenuti si rivela inesorabilmente un’ impresa al di là delle
        possibilità di gran parte delle Industrie.

        Un'altra novità non prevista dalle Aziende, ma voluta del Governo USA, è stata la necessità della
        “riduzione della distanza” tra il Top Management e la “realizzazione” delle analisi più sensibili
        da sottoporre allo stesso Governo USA.

        In altri termini le nuove procedure inducono la creazione di profili che possedendo una
        conoscenza profonda dell’Industria e delle regole di Business traducano le proprie competenze
        in un elemento che possa fondersi con i dati messi a disposizione dei vari ERP e con le nuove
        procedure.
        In questo modo si possono realizzare sintesi che permettono una rapida e completa analisi del
        Business e quindi della solidità o meno dell’Azienda o di un Contratto specifico. Il “Pentagono”
        anche in questo caso con il supporto del CAPE e dell’IDA ha creato i moduli di sintesi chiamati
        “1921”, “1921-1”, “1921-2”, “1921-3” e “1921-4”.

                                                                                                            6
***gr                               Alenia Aermacchi – Washington 4-5 Novembre 2013
Avere le stesse capacità e conoscenze di un “Prime Contractor Top Level” è un vitale per
        qualunque Paese, Sistema Industriale o Azienda.

        Il nostro Paese, con le sue risorse ed i suoi “campioni nazionali”, ha saputo dimostrare le
        proprie capacità ed il proprio valore arrivando ad essere tra i 60 selezionati dal Governo
        Americano che hanno la possibilità di esprimere le proprie opinioni e consigli direttamente all’
        “Office of the Secretary of Defense”, senza passare per “intermediari americani” in merito a
        questi argomenti.

        Le capacità del nostro Paese non sono passate inosservate all’ Institute for Defense Analyses
        (IDA). L’Istituto, che nasce come distaccamento dell’MIT, raccoglie le migliori menti degli Stati
        Uniti per supportare la “White House”, l’”United States Government” , l’”Office of the
        Secretary of Defense” e le “National Security Agency”.

        Per la prima volta un “non americano” è stato ammesso come membro permanente del “Cost
        Control and Program Evaluation Focus Group” al pari livello dei grandi fornitori strategici per
        DoD.

        Nel “Cost Control and Program Evaluation Focus Group” vengono discusse, condivise ed
        eventualmente modificate le leggi e le regole che si trasformeranno in clausole contrattuali.

                                                                                                            7
***gr                              Alenia Aermacchi – Washington 4-5 Novembre 2013
Conservare i privilegi descritti in precedenza non sarà facile, per le “regole
        USA” ogni risultato raggiunto non è definitivo, almeno una volta all’anno si
        deve dimostrare di meritare ancora il ruolo ottenuto tramite procedure di
        “validation”; nel caso non si riuscisse a garantire lo stesso livello
        precedentemente dimostrato non si avrebbe più il diritto a rivestire il ruolo
        precedentemente assegnato.

                                                                                         8
***gr                          Alenia Aermacchi – Washington 4-5 Novembre 2013
L’organizzazione del Governo e del Department of Defence USA per
        valutare le Aziende, i Programmi ed i Contratti

                                                                                9
***gr                         Alenia Aermacchi – Washington 4-5 Novembre 2013
Governo USA – Valutazione Aziende , Programmi e Contratti

           Government
        Accountability Office
               GAO

                                                                                    Source : Office of Secretary of Defense – Office of the Director of Administration and Management

                                                                                                                                                        Source : DoD
                                                                                                                                                                                        10
***gr                             Alenia Aermacchi – Washington 4-5 Novembre 2013
U.S Government Control and Audit Directorate and Agencies:
                                       - Cost Assessment and Program Evaluation (CAPE)
                                       - Defense Contract Management Agency (DCMA)
                                       - Defense Contract Audit Agency (DCAA)

        CAPE
        Cost Assessment and Program Evaluation (CAPE) provides independent analytic advice to the Secretary of Defense on all
        aspects of the Defense program, including alternative weapon systems and force structures, the development and
        evaluation of defense program alternatives, and the cost-effectiveness of defense systems. CAPE is an intellectually
        independent advisor to the Secretary of Defense and President of the United States.
        CAPE avoids making public statements regarding the defense program and, in particular, defending or justifying that
        program. This allows CAPE to take positions in private that it could not easily take in public, to play the role of devil's
        advocate, to propose and analyze alternatives to both military service and administration positions

          DCMA
          The Defense Contract Management Agency (DCMA) is the Department of Defense (DoD) component that works directly
          with Defense suppliers to help ensure that DoD, Federal, and allied government supplies and services are delivered on
          time, at projected cost, and meet all performance requirements. DCMA directly contributes to the military readiness of
          the United States and its allies, and helps preserve the nation's freedom.

          DCAA
          The Defense Contract Audit Agency (DCAA): under the authority, direction, and control of the Under Secretary of Defense
          (Comptroller), (USD(C))/Chief Financial Officer (CFO), Department of Defense.
          The DCAA, while serving the public interest as its primary customer, shall perform all necessary contract audits for the
          Department of Defense and provide accounting and financial advisory services regarding contracts and subcontracts to all
          DoD Components responsible for procurement and contract administration. These services are provided in connection with
          negotiation, administration, and settlement of contracts and subcontracts to ensure taxpayer dollars are spent on fair and
          reasonable contract prices. The DCAA shall provide contract audit services to other Federal agencies as appropriate.
                                                                                                                    Source : DoD
                                                                                                                                       11
***gr                                       Alenia Aermacchi – Washington 4-5 Novembre 2013
I Costi ed i Ricavi

                                                                                12
***gr                         Alenia Aermacchi – Washington 4-5 Novembre 2013
DoD USA Contracts Rules, Control and Elements
        Request for     Proposal           Contract Start                                                                 Contract End
         Proposal                                           Activity 01
                                                                          Activity 02
                                                                                        Activity 03
                                                                                                      Activity 04 Activity n

              Departments of Army, Navy and Air Force –> REQUIREMENTS -> Governmental Program Offices

                                            FAR (DFAR) 15 - Contracting and Negotiation

                                     FAR (DFAR) 34 – Major System Acquisition
                                     FAR (DFAR) 42 – Contract Administration and Audit Services
                                     FAR (DFAR) 52 – Solicitation Provisions and Contract Clauses

                                                    DCAA (Defense Contract Audit Agency) and
                                                   DCMA (Defense Contract Management Agency)

                                                               CAPE (Cost Assessment and Program Evaluation)

                                   Material and Services, Indirect Costs, Other Direct Costs – Direct /Indirect hours

                                       Hourly Rates, G&A, MH e Royalties and Facilities Capital Cost of Money

                                                  Procedures , Policies and Information Technology

                                                    Earned Value Management System (EVMS) 

                                                                                                                                         13
***gr                                       Alenia Aermacchi – Washington 4-5 Novembre 2013
Un esempio di Costi e Ricavi 1/2

            Advanced Tank Technologies Washington, DC

            Proposal Submitted in Response to RFP DAAH01-07-R-0001

              Element of Cost               Amount                               Reference
        Engineering Labor                  $452,151                              Schedule 1
        Manufacturing Labor                   26,412                             Schedule 1
        Direct Labor Overhead @ 56.7%        271,345                             Schedule 2
        Material                             113,175                             Schedule 3 (next page)
        Material Handling Overhead @ 5.0%      5,659                             Schedule 4
           Subtotal                         $868,742
        G&A @ 8.0%                            69,499                             Schedule 5
           Estimated Cost                   $938,241
        Profit @ 10.0%                        93,824*
           Total Price                    $1,032,065
                                           ========

                                                                                               Source : DoD

                                                                                                              14
***gr                          Alenia Aermacchi – Washington 4-5 Novembre 2013
Un esempio di Costi e Ricavi 2/2

        Advanced Tank Technologies Washington, DC

        Proposal Submitted in Response to RFP DAAH01-07-R-0001 Schedule 3
        Shock Absorber Bill of Material
        Support                       Qty                     Unit Price             Total                  Notes
                                     (Note 3)
        Sheet Metal               1,600 sq. meters              $25.00               $40,000                  (1)
        Casings                     750 pcs.                      8.50                 6,375                  (2)
        Plastic                   7,500 pcs.                      5.75                43,125                  (1)
        Springs                   1,700 pcs.                      4.00                 6,800                  (2)
        Bolts                     7,500 pcs.                      2.25                16,875                  (2)
           Total Material                                     $113,175
                                                              ============
        Note

        1. I prezzi esposti sono supportati dalle quotazioni di diversi fornitori. Il prezzo proposto è quello più basso disponibile
           (ACME Corporation quotazione del 21 Ott 2006). I dettaglio delle diverse offerte è disponibile nel file "DAAH01-07-R-
           0001, Dettaglio Offerte Venditori; ulteriori informazioni sono immediatamente disponibili su richiesta.

        2. I prezzi sono verificabili nel catalogo Springs R Us edizione 2006. Il catalogo è disponibile per eventuale verifica
           contabile presso il nostro ufficio commerciale.

        3. Le quantità proposte derivano dai disegni tecnici. I disegni sono nel file "DAAH01-07-R-0001, Engineering Drawing"
           immediatamente disponibile su richiesta.                                                            Source : DoD

                                                                                                                                       15
***gr                                      Alenia Aermacchi – Washington 4-5 Novembre 2013
Esempio di Margini in funzione delle attività

        1.   Per il lavoro sperimentale, di sviluppo, o di ricerca svolti nell'ambito
             di un contratto cost - plus - fixed fee, il margine non deve superare
             il 15 per cento del costo stimato del contratto, escluso lo stesso
             margine.

        2.   Per le attività di architettura o di ingegneria svolte per lavori
             pubblici o di utilità, il margine per la produzione e la consegna di
             disegni, progetti o specifiche non deve superare il 6 per cento del
             costo stimato di costruzione dell'opera pubblica o di utilità
             , margine escluso.

        3.   Per altri contratti cost - plus - fixed fee, il margine non deve
             superare il 10 per cento del costo stimato del contratto, escluso lo
             stesso margine.

                                                                               Source : DoD
                                                                                              16
***gr                        Alenia Aermacchi – Washington 4-5 Novembre 2013
I Contratti e la CWBS (Contractual Work Breakdown Structure)

                                                                                17
***gr                         Alenia Aermacchi – Washington 4-5 Novembre 2013
La Work Breakdown Structure

        La WBS è sempre costituita da due gruppi di elementi
                                                                              La WBS può avere diversi livelli di profondità.
                                                                              Se ci sono elementi ad alto valore, ad alto rischio
         • Il Primo caratterizzante il prodotto oggetto della misurazione     o da tenere “sotto controllo” per diverse
         • Il Secondo comune e tutti i prodotti                               motivazioni si scende al di sotto il “terzo livello”

                                                                                                Anche gli “elementi comuni” possono avere
                                                                                                dei livelli più profondi nel caso sia necessario
                                                                                                controllare alcune attività “sensibili” come i
                                                                                                Training ed il Supporto al Prodotto.

                                                                                                                   Source : DoD
                                                                                                                                                   18
***gr                                     Alenia Aermacchi – Washington 4-5 Novembre 2013
La WBS del Programma e del Contratto - “Prime Contractor”
                                e quella del “Sub Contractor”

             Generalmente la WBS di “Programma” è diversa da quella del “Contratto”, ma le
             differenze devono limitarsi solo al livello di dettaglio e non possono modificare le
             “struttura di base”

        La WBS del “Prime Contractor”, ovvero di colui che stipula il contratto con il Cliente finale, deve
        essere correlata con quelle dei suoi “Sub Contractor”, ovvero di coloro che stipulano un contratto
        con il “Prime Contractor” e non direttamente con il Cliente finale

                                                                                                              Source : DoD

                                                                                                                             19
***gr                               Alenia Aermacchi – Washington 4-5 Novembre 2013
La WBS, la “Resource Data Table” (RDT) ed i “confronti”

         Tutte le WBS, quella del Cliente (Program Office), quella del “Prime Contractor” e
         quella dei “Sub Contractor” sono correlate tra di loro.
         La “Resouce Data Table” traccia la correlazione tra le diverse WBS e le diverse
         Organizzazioni

        Una volta che la “mappa delle risorse” è stata tracciata vengono individuati i “punti
        di controllo” ed i “Contractor” che saranno soggetti a verifica.

                                                                                           Source : DoD

                                                                                                          20
***gr                         Alenia Aermacchi – Washington 4-5 Novembre 2013
FAR (Federal Acquisition Regulation) /
        DFAR (Defense Federal Acquisition Regulation) and
        CAS (Cost Accounting Standards)

                                                                              21
***gr                       Alenia Aermacchi – Washington 4-5 Novembre 2013
FAR/DFAR
                                        and CAS

        Le acquisizioni dei Beni e Servizi da parte del Governo USA sono regolamentate dalle FAR
        (Federal Acquisition Regulation).

        La corretta applicazione delle FAR ai contratti del DoD US è definita delle DFAR (Defense Federal
        Acquisition Regulation).
                      Esempi:
                      52.215-10 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA
                      52.216-7 ALLOWABLE COST AND PAYMENT
                      52.230-2 COST ACCOUNTING STANDARDS
                      52.230-6 ADMINISTRATION OF COST ACCOUNTING STANDARDS
                      252.215-7002 COST ESTIMATING SYSTEMS REQUIREMENTS

        Le “Cost Accounting Standards” (CAS) sono un gruppo di 19 regole promulgate dal United
        States Government per definire i costi “riconoscibili” durante una negoziazione per acquisire
        Beni e Servizi.

        Le CAS differisco dalle FAR in quanto le FAR si applicano in pratica a tutti i Contratti ed a tutti i
        Fornitori mentre le CAS si applicano solo ai principali Contratti.
                        Esempi:
                        401 Consistency in Estimating, Accumulating and Reporting Costs
                        402 Consistency in Allocating Costs Incurred for the Same Purpose
                                                                                                 Source : Gov USA – DoD
                                                                                                                          22
***gr                                          Alenia Aermacchi – Washington 4-5 Novembre 2013
Summary

                                                                    23
***gr             Alenia Aermacchi – Washington 4-5 Novembre 2013
Summary

        Il Controllo dei Costi e la Valutazione dei Programmi sono diventati l’argomento
        principale per decidere la sorte di Nazioni ed Aziende.

        I parametri economici e finanziari tradizionali non sono più sufficienti a garantire la
        corretta valutazione per decretare il successo o la chiusura di un Programma.

        Nazioni e Sistemi che più hanno subito gli eventi di questi ultimi anni hanno avviato una
        radicale, profonda e rapida rivisitazione dei propri metodi di controllo e valutazione.

        Il Governo gli Stati Uniti ha intrapreso lo sviluppo di nuovi evoluti metodi e ne ha
        imposto l’applicazione ai propri Fornitori con l’obiettivo di tutelare le proprie Aziende da
        gestioni “inadeguate”.

        Conoscere questi metodi decreterà nel prossimo futuro l’affermazione o il fallimento
        per molte Aziende.

        Oggi abbiamo cominciato a conoscere queste nuove tecniche.

                                                                                                       24
***gr                            Alenia Aermacchi – Washington 4-5 Novembre 2013
Come Finmeccanica ed Alenia Aermacchi interpretano il
                        ruolo di un “Campione Nazionale”

        AleniaAermacchi - Società del Gruppo Finmeccanica è onorata della
        possibilità che il Governo Italiano, il Ministero degli Esteri e
        l’Ambasciata d’Italia a Washington le stanno dando.

        Condividere e diffondere i risultati che stiamo ottenendo, le capacità in
        nostro possesso e le conoscenze acquisite è un nostro dovere.

        Il ruolo dei “Campioni Nazionali” è dimostrare che la fiducia in essi
        riposta non deve essere mai rimpianta, i “Campioni” devono rendere
        orgogliosi tutti quelli che credono in loro.

        AleniaAermacchi e le Persone che lavorano in questo grande Gruppo
        sono consci della loro responsabilità e degli obblighi che da essa
        derivano. Sanno che non possono deludere la fiducia in essi riposta.

                                                                                    25
***gr                       Alenia Aermacchi – Washington 4-5 Novembre 2013
Next Steps

        Eventuali prossimi punti di approfondimento:

        I Costi e l’EVMS (Earned Value Management System) – I Requisiti del Governo USA

        I “modelli” di calcolo. Come generare modelli sempre nuovi e sempre conformi alle
        continue variazioni dei requisiti e delle domande del Governo USA utilizzando le
        banche dati aziendali

                                                                                            26
***gr                        Alenia Aermacchi – Washington 4-5 Novembre 2013
Puoi anche leggere